Alta Gohta turret
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
The Baju Urip (later renamed to: Gagak Rimang) FSO is based on a VLCC converison with a capacity of 2 million barrels. The faciity is situated ...
Technology screening and coceptual design of a floating liquifaction unit for natural gas (FLNG). Planned production capacity is 3.5 Mt/a.
Feed study for the purpose of converting a VLCC into a gas-FPSO
Floating liquifaction unit for natural gas (FLNG). The facility is based on conversion of a Moss LNG carrier. A new hull hull section with liquifaction ...
The Ichtys FPSO is a faciltiy for treatment of condensate from the Ichtys gas field. The facilty has an utra-long desing life of 40 year without going of the field.
Techical advisory work related to the refurbishment and redeployment of the Balder/Jotun FPSO.
Concept design/pre-FEED. The concept was later modified as basis for desing of the Knarr FPSO.