3D CCS H2020
The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).
Structural design ,
Machinery and System ,
Layout, cross discipline ,
Electrical power systems ,
HVAC ,
Hydro dynamics and static ,
Process
The Ichtys FPSO is a faciltiy for treatment of condensate from the Ichtys gas field. The facilty has an utra-long desing life of 40 year without going of the field.
The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.