Åsgard A FPSO
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
Also referred to as FEED stage (front end engineering) involves all engineering task needed for class approval of the design. Further the engineering deliverables may form the basis for a class 2 (AACEi) cost estimate.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
Two ships (98 m loa) have been build, both transporting passangers and cargo between Lakshadweep Archipelago and Kerala - mainland India.
Chemical tanker (135m loa, 15 000 Dwt). The ship has 14 expoxy coated tanks. 6 ships have been built. The ship has ultra low resistance and likely ...
Feed study for the purpose of converting a VLCC into a gas-FPSO