Golar MK-II (FLNG)

Foto: Pixelsmia
  • Period: Year: 2022-
  • Client: Golar LNG
  • Disciplines:

    Machinery and System ,

    Structural design ,

    Electrical power systems ,

    HVAC ,

    Hydro dynamics and static ,

    Instrumentation and Telecom ,

    Layout, cross discipline ,

    Process

Floating liquifaction unit for natural gas (FLNG). The facility is based on conversion of a Moss LNG carrier. A new hull hull section with liquifaction trains will be installed between tank 2 and 3 of the donor ship.

Related references

3D_CCS_H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.