Golar MK-II (FLNG)

Foto: Pixelsmia
  • Period: Year: 2022-
  • Client: Golar LNG
  • Disciplines:

    Machinery and System ,

    Structural design ,

    Electrical power systems ,

    HVAC ,

    Hydro dynamics and static ,

    Instrumentation and Telecom ,

    Layout, cross discipline ,

    Process

Floating liquifaction unit for natural gas (FLNG). The facility is based on conversion of a Moss LNG carrier. A new hull hull section with liquifaction trains will be installed between tank 2 and 3 of the donor ship.

Related references

3D CCS H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.