Detail Engineering

In this phase engineering is develop further to a level with sufficent detail for construction.

Related references

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.

Brevik TP150

Chemical tanker (135m loa, 15 000 Dwt). The ship has 14 expoxy coated tanks. 6 ships have been built. The ship has ultra low resistance and likely ...

H6e Drilling Semi

Substrukture for Akers H6e drilling rigs.

JOTUN Refurbishment

Techical advisory work related to the refurbishment and redeployment of the Balder/Jotun FPSO.