Cash FLNG

Foto: Brevik Engineering
  • Period: Year: 2009-2011
  • Client: PTTEPy
  • Area of operation: Indonesia
  • Regulations/class: Australia
  • Disciplines:

    Machinery and System ,

    Layout, cross discipline ,

    Electrical power systems ,

    HVAC ,

    Hydro dynamics and static ,

    Instrumentation and Telecom ,

    Process ,

    Structural design ,

    Technical - commercial

Technology screening and coceptual design of a floating liquifaction unit for natural gas (FLNG). Planned production capacity is 3.5 Mt/a. LNG is contained in 8 membrane tanks with a totalt coapcity of 202 000 m3. In addition there is storrage capacity for 40 000 m3 and 58 000 m3 condensate.

Related references

3D_CCS_H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.