At this stage the technical and commercial feasibility of a proposed projects will be evaluated. Much of the engineering will qualitative cross discipline activities conducted in interaction with client. Discipline specific engineering is limited high risk areas. Feasibility studies may form the basis for cost estimates class 5 (AACEi).