The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
Electrical power systems ,
Hydro dynamics and static ,
HVAC ,
Instrumentation and Telecom ,
Layout, cross discipline ,
Machinery and System ,
Process ,
Structural design ,
Technical - commercial
Study for the purpose of selecting a storage solution for life extension of the Njord Oil field. Three concepts was developed: A)Newbuild bespoke solution B)Conversion of a shuttel tanker C)Refurishment of the 20 year old Nord Bravo. All desing and engineering was done by Brevik Engineering. Cost/commercial studies was done in cooperation with the broker Bassoe Offshore.
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
The Baju Urip (later renamed to: Gagak Rimang) FSO is based on a VLCC converison with a capacity of 2 million barrels. The faciity is situated ...