LNG FSU Conversion DD

Foto: OLT Offshore LNG Toscana
  • Period: Year: 2015 – 2017
  • Client: Global Maritime ltd
  • Area of operation: Malta
  • Disciplines:

    Technical - commercial ,

    Electrical power systems ,

    HVAC ,

    Hydro dynamics and static ,

    Layout, cross discipline ,

    Machinery and System ,

    Process ,

    Structural design

Level of Engineering R&D/Consultancy

Due diligence and consultancy service in connection with devolpment on an FSRU based on conversion of a Moss tanker.

Related references

3D_CCS_H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Cash FLNG

Technology screening and coceptual design of a floating liquifaction unit for natural gas (FLNG). Planned production capacity is 3.5 Mt/a.

CO2 carrier

LCO2 carrier with two bilobe tanks with a total capacity of 10 800 m3 CO2. Operational pressure is 15 barg. The ship is optimized for ...