3D CCS H2020
The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).
Electrical power systems ,
HVAC ,
Hydro dynamics and static ,
Layout, cross discipline ,
Machinery and System ,
Process ,
Structural design
LCO2 carrier with two bilobe tanks with a total capacity of 10 800 m3 CO2. Operational pressure is 15 barg. The ship is optimized for medium distance/North sea trades. The ship is 130 loa and can as such enter the Norhtern Lights port facility.
The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).
The project involved modification of the vessel for new, complex towing operation. Brevik Engineering was involved in intact and stability calculations, physical inclination tests, development of operational documentation related to stability.
Two ships (98 m loa) have been build, both transporting passangers and cargo between Lakshadweep Archipelago and Kerala - mainland India.