LNG Cargo tank

Foto: Brevik Engineering
  • Period: Year: 2008-2009
  • Client: Aker Solution – Wadan Yards LNG Technology
  • Disciplines:

    Structural design

Responsible for structural analysis in development of a prismatic tank concept.

Related references

3D_CCS_H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

BB Power

The project involved modification of the vessel for new, complex towing operation. Brevik Engineerings was intact and stability calculations, physical ...

Brevik PAX 400

Two ships (98 m loa) have been build, both transporting passangers and cargo between Lakshadweep Archipelago and Kerala - mainland India.