Tentech FLNG

  • Period: Year: 2009
  • Client: Aker Solution
  • Area of operation: Generic
  • Disciplines:

    Structural design ,

    Layout, cross discipline

Conceptual design of a floating liquifaction unit for natural gas (FLNG) based on the Tentech FPSO concept.

Related references

3D_CCS_H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.