Tentech FLNG

  • Period: Year: 2009
  • Client: Aker Solution
  • Area of operation: Generic
  • Disciplines:

    Structural design ,

    Layout, cross discipline

Conceptual design of a floating liquifaction unit for natural gas (FLNG) based on the Tentech FPSO concept.

Related references

3D CCS H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.