Skarv FPSO

Foto: Aker BP
  • Period: Year: 2005-2008
  • Client: Aker Solutions BP
  • Area of operation: Norway
  • Work load: 8000
  • Regulations/class: Norway
  • Disciplines:

    Structural design ,

    Layout, cross discipline ,

    Hydro dynamics and static

Conceptual study related to new build FPSO. Hull design, hull structure and weight calculations. Assistance to technical specification.

FEED study related to new build FPSO for operation at Skarv Field. Hull design, structural design and weight calculations. Follow-on engineering of hull detail design at Samsung Heavy Industries construction yard.

Related references

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.

Banyu Urip FSO

The Baju Urip (later renamed to: Gagak Rimang) FSO is based on a VLCC converison with a capacity of 2 million barrels. The faciity is situated ...