Shtokman Gas FSPO

  • Period: Year: 2009-2011
  • Client: Aker Solutions SDAG
  • Area of operation: Russia (Bartz Sea)
  • Regulations/class: Russia
  • Disciplines:

    Structural design ,

    Layout, cross discipline ,

    Hydro dynamics and static ,

    Machinery and System ,

    HVAC ,

    Process

Level of Engineering Concept development Basic Engineering

The Shtokman Gas field is located fare east in the Barenz Sea. The location will experience sea ice conditions for long periods. Gas is planned to be transferred to shore via pipeline. The facility

Related references

3D CCS H2020

The 3D (DMX Demonstration Dunkirk) is CCS project located to Arcelor Mittal steelmill in Dunkerque (France).

Alta Gohta turret

The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.

Åsgard A FPSO

The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.