Alta Gohta turret
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
Machinery and System ,
HVAC ,
Process ,
Electrical power systems ,
Instrumentation and Telecom
Delopment of a floating storrage unit for the Martin Linge field. The FSO was based on a SAMSUNG hull.
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
The Baju Urip (later renamed to: Gagak Rimang) FSO is based on a VLCC converison with a capacity of 2 million barrels. The faciity is situated ...