Alta Gohta turret
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
Machinery and System ,
Electrical power systems ,
HVAC ,
Process
Concept studies for marine and utility systems, cargo arrangements and cargo system design with descriptions, power and heat generation.
The sope of the project was to study and recommend a turret solution for an FPSO for Alta Gotha oil field in the Barentz Sea.
The FPSO was delivered by Aker as a complete engineering, procurement and construction (EPC) contract and is based on the Tentech 900 designs.
The Baju Urip (later renamed to: Gagak Rimang) FSO is based on a VLCC converison with a capacity of 2 million barrels. The faciity is situated ...