Marine Warranty Sheringham Shoal

Foto: Sheringham Shoal
  • Period: Year: 2010 – 2013
  • Client: GL Noble Denton Oslo AS
  • Area of operation: United Kingdom
  • Disciplines:

    Hydro dynamics and static ,

    Structural design ,

    Layout, cross discipline

Warrenty serveyor services in connection with wind mill installation at the Sheringham Shoal wind park.

Related references

2rd Party Review Dolwin Beta

Dolvwin Beta is a high voltage direct current export hub for windpower north of the German Frisian coast. The platform has the shape of a semi...

H6e Drilling Semi

Substrukture for Akers H6e drilling rigs.

MaMA_Haven_JS

Due diligence and consultancy service in connection with devolpment on an FSR+AG42U based on conversion of a Moss tanker.