HLV Uglen – Crane upgrade from 600 to 800(t)
June 20, 2019
Aker H6e
June 18, 2019

Windmill installation barge

Windmill installation barge

Year (LPP): 2014

Client: Ingenium

Man-hours: 1000

Scope: Structural Engineering and Stability

Description

Class package:

  • Hydrodynamic load analysis
  • Structure FEM ultimate and fatigue strength analysis
  • Class drawings

Related Projects